Elite Stone we grind the substrate then fill what needs filled then we prime with a moisture tolerant primers then we install the Elite Stone We do it the right way the first time around.
More cost information & deals:
![]() | ![]() | Handyman Coupons in Solon, OH$55 - service call discount |
![]() | ![]() | Handyman Coupons in Newark, OH25% Off - multiple time user |
![]() | ![]() | Handyman Coupons in Newark, OH$50 - spend over 500 get |
![]() | ![]() | Flooring Coupons in Northfield, OH$100 - New customer discount |
Hardwood flooring in living room Project Cost: $3112 |
||
Flooring: 12 mm laminate 5". 500 square feet. Project Cost: $1039 |
||
removing wallpaper in three bedrooms, mud room, bathroom, and hallway. and paint those walls. Also paint basem Project Cost: $3744 |
||
i need a post and mailbox installed. Project Cost: $153 |
||
Just moving in and need a professional that can install 2 flat screen TVs; a 32 inch and 48 or 52 inch. We hav Project Cost: $133 |
||
satellite dish removal from first story roo Project Cost: $79 |
||
bdrm ceiling, 10x12, need hung, taped and textured. Will pay 250 labor, will need drywall picked up from hd Project Cost: $320 |
||
Delivery and installation of Inground basketball system. Need a contractor that can install 5-10 of these per Project Cost: $337 |
||
Installing laminate flooring Project Cost: $1578 |
||
I have a rental property that needs basic carpet removed/ basic new neutral carpet installed (we do not have t Project Cost: $990 |
||
Mirrors and changing out light fixtures in 2 rooms Project Cost: $225 |
||
Need to have new toilet installed Project Cost: $149 |
||
Need Someone to Re-finish Harwood Floors I have a place that needs the hardwood floors refinished it's 850 Project Cost: $2916 |
||
Roofing
Plumbing
Electricity
Project Cost: $3716 |
||
Floor install Project Cost: $4743 |
By clicking “Send”, you authorize us to send you an automated text with a link to the coupon. Receipt of text is not a condition of purchase. See terms & privacy policy.
|
Your name |
Location |
Final Cost$ .00 |